Zheng Heng Dynamic

The business of Zhengheng group at home and abroad involves banking, real estate, investment, network, human resources, science and technology, cultural innovation and business travel industry and other fields.While actively investing in the industrial layout, Zhengheng group is also vigorously introducing the advanced management mode of developed countries and promoting the industrial upgrading of Cambodia. In this process, it reconstructs the business model and organizational model, creates an industrial cluster with Zhengheng characteristics, and is committed to becoming an international first-class comprehensive development led by strategy, driven by innovation and promoted by value enterprise groups.
 

The USD 300 Million Sihanoukville Port Road Construction and Maintenance Project Supervised by Prime Minister Hun Sen to be Completed Soon, Effectively Enhancing the Value of Coastal New Town Dara Sakor in West Cambodia

Release time:2020-06-11 Reading volume:494 Source:Ministry of Finance of Cambodia By: Jiahao

  


Prime Minister Hun Sen inspected the 34-road Construction and Maintenance Project in Sihanoukville Port.

 

  (Preah Sihanouk) Ninety percent of the USD 300 Million 34-Road Construction and Maintenance Project in Preah Sihanouk funded by the government has been completed. Prime Minister Hun Sen, who is rarely seen since the outbreak of the pandemic, headed to Sihanoukville Port to inspect engineering quality before the completion of the project.

 

  Tea Banh, Deputy Prime Minister & Minister of Defense, Chea Sophara, Deputy Prime Minister & Minister of Land Management, Urban Planning and Construction, and other government ministers inspected the project with the delegation as project supervisors.

 

  After arriving at Sihanoukville Port, Prime Minister Hun Sen inspected each road and was debriefed by relevant leaders. While guiding the site work, Prime Minister Hun Sen gave explicit instructions to the subsequent infrastructure development work in Preah Sihanouk.

 

  As revealed by the government report, the 34-Road Construction and Maintenance Project in Preah Sihanouk invested with USD 300 million was initiated on November 16, 2019. With 90% of the work completed now, it’s expected to be completed in 8 months.

 

  The 34 roads have a total length about 84 kilometers, composed of 3 trunk roads, 16 secondary trunk roads and 15 small roads.

 

  The 3 trunk roads have a total length of 22 kilometers and a width of 50 meters, built with 6 car lanes and 2 motorbike lanes. They are Ream Road (Road 45), Ream Beach Road and Zongtiemao Road (Road 47).

 

  The 16 secondary trunk roads offer a total length of about 50 kilometers and a width of 20 to 40 meters; the 15 small roads have a total length of about 12 kilometers and a width of 8 to 40 meters.

 

  In light of the rapid development of Sihanoukville Port, the Cambodian government made the sudden decision of maintaining and constructing 34 roads last year, which will lay a foundation for the development of Preah Sihanouk into a mufti-functional special economic zone.

 

  It’s understood that Shenzhen Urban Planning and Design Institute is assisting the Cambodian government with the preparation of the Master Plan of Preah Sihanouk Mufti-Functional Special Economic Zone. Sihanoukville Port will be taken as an important growth engine for Cambodia and developed into a livable, business-friendly and tourist-friendly innovative city powered by green development.

 
/var/www/html/en/thinkphp/library/think/Debug.php:193:string '/var/www/html/en/Home/' (length=22)